What each finish tier actually buys, trade by trade

Basic to Ultimate on turnkey.mt's calculator runs 336 to 1212 €/m². The gap is not spread evenly across the trades — tiling, second fix electrics and doors multiply four or five times, while screed, insulation and gypsum roughly double. That pattern is where a finishing budget is really decided.

A finished turnkey interior in Malta
Turnkey.mt

Finish tiers are normally sold with adjectives. Basic is "functional", the top tier is "premium", and somewhere in the middle there is "quality". None of that tells you anything, because the adjectives are attached to the project as a whole and the money is not. The money is attached to individual trades, and those trades behave completely differently from one another.

Here is the same question answered with the rate card. Turnkey.mt's calculator carries four tiers across ten trades. The four whole-project totals are 336, 480, 742 and 1212 €/m². Bottom to top is a multiple of roughly 3.6 — but that multiple is an average of ten very unequal things, and knowing which is which is the single most useful piece of information you can have before you start allocating.

The spread, trade by trade

These are the Basic and Ultimate columns for seven of the ten trades. The calculator itself holds all ten at all four tiers; the two outer columns are what make the point.

TradeBasic (€/m²)Ultimate (€/m²)Multiple
Floor & wall tiling663004.5x
Second fix electrics241205x
Internal doors241084.5x
External doors & windows783003.8x
Gypsum3472~2.1x
Insulation2260under 3x
Screed18362x

Read the multiple column downwards and a pattern appears immediately. The top four items multiply by between 3.8 and 5. The bottom three multiply by between 2 and just under 3. That is not a coincidence and it is not a pricing quirk.

What the trades that multiply have in common

Tiling, second fix electrics, internal doors, external doors and windows. Every one of them is a surface or an object you can see, touch and point at. And every one of them has, in practice, no upper price limit — a tile can cost anything, a door handle can cost anything, an aluminium system with triple glazing and a concealed frame costs a multiple of a basic one. The rate card is not measuring more work at Ultimate. It is largely measuring more expensive things being installed by the same trades.

Second fix electrics at 24 rising to 120 €/m² is the clearest case. The cables are already in the walls at first fix. What the fivefold difference buys is the density and quality of what terminates in them: how many circuits, how many points per room, what the switches and fittings are, whether there is any automation. All of it is accessible from the room side of the wall.

External doors and windows behave slightly differently and deserve a note. At 78 to 300 €/m² the multiple is the lowest of the four, but the absolute figures are the highest at Basic and joint-highest at Ultimate. This is the trade where the visible object and the building's performance are the same item — an aperture is both the thing you look at and the largest single hole in your thermal envelope. It is also the trade most likely to touch external appearance, which in a block means the condominium has a view, and in some cases means the Planning Authority does too.

What the trades that barely move have in common

Screed, insulation, gypsum. Nobody will ever see any of them. They are covered, in that order, by the things above them in the table.

Screed doubling from 18 to 36 €/m² is the smallest movement on the card, and the reason is that a screed has one job. It has to be flat, at the right level, with the right falls, and dry enough to tile onto. There is no premium screed to buy because there is no visible screed to admire. The extra buys better material, more careful levelling and better drying discipline — real things, but bounded ones.

Insulation runs 22 to 60 €/m². Gypsum runs 34 to 72. Both roughly double or a little more. In both cases you are buying performance rather than appearance: more insulation thickness, better boards, better detailing at junctions.

The editorial point, stated plainly

The trades that barely move are the ones buried behind everything else. The trades that multiply are the visible surfaces you could change later.

That is an argument for a specific way of allocating a limited budget, and it is close to the opposite of what most people do.

If you tile at Basic and hate it in eight years, you lift the tiles and retile. It is disruptive, dusty and it costs money, but it is a normal, self-contained job. The same is true of internal doors, of light fittings and switch plates, of most of what sits on the room side of the plaster. Choosing Basic on those trades is a deferral, not a permanent decision.

Insulation is not a deferral. Insulation at 22 €/m² sits under the screed and behind the gypsum. To improve it later you take off the finishes you just paid for — which, if you spent at Ultimate on tiling at 300 €/m², means destroying the most expensive line on your rate card to fix the cheapest. That is why cheapening insulation to fund a visible upgrade is the one trade-off on this card that cannot be unwound. The card prices insulation at Ultimate at 60 €/m². Against a whole-project Ultimate total of 1212 €/m², that is a small share of the budget for the one thing you get exactly one attempt at.

The same logic, more weakly, applies to screed and gypsum. Both are covered. Both are cheap to get right the first time and expensive to revisit.

How to use this on your own property

Maltese property is normally sold in shell form, so you are not upgrading an existing finish — you are specifying every one of these ten trades from nothing, in one decision, usually under time pressure. British and other EU buyers frequently arrive expecting a habitable flat with some tired decoration. What you have is a concrete box, and the whole 336 to 1212 €/m² range is ahead of you rather than behind you.

Three practical consequences.

  1. Do not choose a tier. Choose per trade. A single adjective applied to ten trades hides the only decision that matters. The tiers are a convenience for producing a total, not a specification you have to buy as a block.
  2. Spend upwards on the buried trades first. They are the cheapest lines on the card in absolute terms and the only ones you cannot revisit.
  3. Treat the visible trades as your adjustment mechanism. Tiling, internal doors and second fix electrics are where 4.5x and 5x multiples live. That is where a budget flexes, and it is where flexing costs you the least in the long run because the decision stays reversible.

If you want the middle tiers, the calculator carries them: 480 and 742 €/m² are the two totals between Basic and Ultimate, with each of the ten trades priced at those levels too. But run the exercise the other way round. Set the buried trades where you want them, and let the visible ones absorb whatever the total needs to be.

Common questions

Which single trade moves my finishing budget the most?
Floor and wall tiling and external doors and windows. Both run from 66 and 78 €/m² at Basic to 300 €/m² at Ultimate. Between them they account for more of the Basic-to-Ultimate gap than any other pair of trades on the rate card.
Can I mix tiers — Ultimate tiling with Basic insulation?
Arithmetically yes, and people do it. But it is the wrong way round. Tiling at 66 €/m² can be lifted and redone in ten years. Insulation at 22 €/m² sits behind the screed, the gypsum and the tiles, and going back to it means taking all three off again.
Why does screed barely change between tiers, when tiling changes so much?
Screed is 18 €/m² at Basic and 36 €/m² at Ultimate — exactly double, and the smallest movement on the card. A screed either meets level and falls or it does not. There is no luxury version to buy, because nobody will ever see it. Tiling is the opposite: the price of the tile itself has no ceiling.
The tiers are Basic, and then what? What do the four totals mean?
The calculator's four tiers total 336, 480, 742 and 1212 €/m². Those are whole-project rates per square metre covering all ten trade lines, not the price of any one trade. Moving from the bottom tier to the top multiplies the total by roughly 3.6.

What we could not establish

  • The rate card states rates per square metre but does not define the basis — whether that is internal floor area, gross area, or something else. Two identical apartments measured differently produce different totals.
  • The card gives no specification behind each tier: what insulation thickness or material Basic's 22 €/m² buys versus Ultimate's 60 €/m² is not published, so the rate cannot be checked against a product.
  • There is no labour and materials split. On tiling in particular, where the tile itself carries the range, that split would change how a reader reads the 66 to 300 spread.
  • No Gozo uplift is published. Every delivery to Gozo crosses on the ferry, but the rate card carries one set of figures and does not say whether they hold on both islands.
  • Planning Authority permit fees, architect fees, condominium-related costs and any work to common parts sit outside the ten trade lines and are not priced anywhere on the card.
  • Which items fall inside each of the ten trade lines is not itemised, so the boundary between, say, second fix electrics and the fittings it serves is not established.

Sources

  1. Turnkey.mt budget calculator rate card (js/main.js) — Turnkey.mt · read 2026-09-02

Drafted with Claude — claude-opus-5, then read, corrected and approved by Neil Bennett before publication. We do not publish anything a person has not read.